Which two sequences include the "uired"eps, in the correct order, for configuring Failover on the FirePass Controller? (Choose two.)

0 votes
asked Oct 25, 2016 in F50-515 F5 FirePass v6 by admin (21,060 points)
Which two sequences include the "uired"eps, in the correct order, for configuring Failover on the FirePass Controller? (Choose two.)

1.restart First (Primary)
2.restart Second (Secondary)
3.enable Failover option on First
4.enable Failover option on Second
5.configure virtual IP Address on First
6. configure virtual IP Address on Second

A. 3, 1, 5, 4, 2, 6
B. 3, 1, 4, 2, 5, 6
C. 3, 1, 5, 1, 4, 2, 6, 2
D. 3, 1, 4, 2, 5, 1, 6, 2
E. 5, 1, 3, 1, 6, 2, 4, 2
F. 5, 1, 6, 2, 3, 1, 4, 2

1 Answer

0 votes
answered Oct 25, 2016 by admin (21,060 points)
Answer: C,D
Most active Members
this month:
    Gute Mathe-Fragen - Bestes Mathe-Forum
    ...